 |
- We install
the tunnel planking
- January 2000
|
|
|
|
The tunnel planking started with placing
the battens. They are the boards running the length of the boat.
The battens stiffen the 1/4 in. plywood covering. |
 |
|
We start the plywood panels. This
turned out to be a harder job on our backs than we first thought. |
 |
|
All that remains is the bottom hull
planking. Yahoo!!! |
 |
|
Is this a boat or a basketball court? |
 |
|
Done for the day!!!! |
 |
This is our
tired helpers. Our daughter and her husband. It took several
days and lots of aspirin to get over the tunnel planking! |
Back
|