 |
- We turn
the hull...
- December, 2000
|
| This was a
great day for us. The end of Phase Three. They say a picture
is worth a thousand word, and I think it is true here. Sandi
and I can't thank Ed's Crane enough for the really professional
way they handled this project. |
|
 |
|
Ed's Crane arrives and we strap
the hull. |
 |
|
We move the hull to the side of
the building form. |
 |
|
We adjust the straps to pick up
the side first. |
 |
| Another
shot of the hull on the side of the building form where we adjusted
the lift straps. |
 |
|
We lift the hull to a vertical
position. |
 |
|
The hull is now ready for the lift
to the other side of the building form. |
 |
|
Up, up and away...... Lift straps
don't fail me now..... |
 |
|
Back to the building form, only
right side up...... |
 |
|
Almost back on the form. |
 |
|
All turned... We get our
first view of the main deck... |
 |
|
I'm king of the world...... |
Back |